Job Safety Analysis for Lifting and Rigging

LOGO
JOB SAFETY ANALYSIS





Doc. No.:
Rev.:
Date:
Page:

Project:                     Project#:                     Area:

General Comments:

Date:                                         Supervisor:  

Job Description:Lifting & Rigging Activity (Loading/Unloading of the Equipment)
Item
Detail of Activity
Equipment & Tools used
Risk Involved
Preventive Measure
Responsible Person
Severity Rating
1

TRANSPORTATION  OF  THE MATERIALS
& CRANE TO JOB SITE.


·    CRANE
·    TRAILER
·    FLAT BED
·    MULTI AXEL TRAILER
·       LIFTING GEARS

(SLINGS,
SHACKLES,
WEB-BELT,
TAG LINE,
CHAIN BLOCK,
LEVER HOST, FORK LIFTER, PICK WAY TRUCK & ETC).
·    UNEVEN ROAD
·    UNSAFE CONDITIONS
·    CRANE SHOULD BE CHECKED, BEFORE TRANSPORTATION TO JOB SITE ON DAILY BASIS.
RIGGING SUPERVISOR
2
2
2
MATERIAL LOADING / UNLOADING

·    CRANE COLLAPSE DURING
·    LIFTING
·    PERSONAL INJUREY
·    PROPERTY DAMAGE
·    PROPER ACCESS (BRIDGES) SHOULD BE USED.
·    FLAGMAN WILL BE ASSIGNED WITH THE CRANE & HEAVY EQUIPMENT.
·    MATERIAL MUST BE CHECKED BEFORE LOADING / UNLOADING.
AREA AUTHORIZES

3
3
2
3

3
SETTING UP CRANE FOR LIFTING.

·    CRANE FAILURE DUE TO HYDROLIC SYSTEM
·    CAUSE OF SERIOUS
·    MATERIAL MUST BE PROPERLY SECURED WITH SLING & SHACKLES BEFORE LIFTING UP.
·    CRANE WILL BE SET UP AT LEVEL SURFACE WITH OUTRIGGER PADS.
·    OUTRIGGERS WILL BE FULLY EXTENDED CRANE.
E & P I/C
2
4
LIFTING WITH CRANE
·    FIRE DUE TO LOOSE WIRING
·    CRANE MUST BE 3RD PARTY CERTIFIED.
·    ALL LIFTS WILL BE UNDER THE RATED CAPACITY OF CRANE I.E. LOAD CHART.
HSE INSPECTOR

2
5
INSPECTION OF CRANE
& RIGGING GEARS
·    FALL OF OBJECT

·    CERTIFIED CRANE OPERATOR AND RIGGERS (3RD PARTY CERTIFIED) WILL CARRY OUT THE LIFTING ACTIVITY.
RIGGING ENGINEER
3
6
DEMOBILIZATION
CRANES
EQUIPMENT’S,
TOOLS AND WORKER.

·    PERSONNEL INJURY
·    SLIPPING

·    TRIPPING
·    ELECTRIC SHOCK
·    DUE TO POWER LINE
·    ALL LIFTING TACKLES WILL HAVE 3RD PARTY
·    CERTIFICATIONS & HEALTHY (GOOD CONDITION).
·    RIGGING PLAN & STUDY REQUIRED FOR HEAVY LIFTING.

·    ONLY SINGLE PERSON MUST BE GIVEN SIGNAL TO CRANE OPERATOR.
·    EMPLOYEES SHOULD BE TRAINED ON SAFE RIGGING TECHNIQUES.

·    TOOLBOX TALK MUST BE CONDUCTED BEFORE EACH LIFT.
·    LIFTING AREA SHOULD BE BARRICADED WITH WARNING.
·    ALL LOADS WILL BE CONTROLLED BY TAG LINES, IF LENGTH IS LONG THAN DOUBLE TAG LINE USED.
·    LIFTING CREW WILL WORK WITH COMPLETE PPES.
·    AREA MUST BE CHECKED & FREE FROM ELECTRICAL WIRES BEFORE ASSEMBLING TO THE CRANE.
RIGGING SUPERVISOR

2

7

WORK AT HEIGHT
SCAFFOLDING CHARRY PICKLES
·    MATERIAL CAN FALL
·    PERSONAL FALL
·    IMPROPER SCAFFOLDING ERECTION
·    TOOL & JOINTS ETC. SHOULD BE LIFT BY ROPE & BASKET
·    SCAFFOLDING SHOULD BE ERECTED UNDER SKILLED SUPERVISION.
·    FULL BODY HARNESS MUST BE WORN WHILE WORK AT HEIGHT 6 FEET & ABOVE.
·    SCAFFOLDING MUST BE ERRECTED WITH STANDARD & INSPECTED BY SCAFFOLDING INSPECTOR.
RIGGING SUPERVISOR




SCAFFOLDING INSPECTOR
2
3
3
8

WORK AT NIGHT
LIGHTS & STANDS (FLOOD LIGHTS WHITE)
·    MANUAL HANDLING
·    SLIP, TRIP & FALL
·    POOR ILLUMINATION
·    WORK WOULD BE NEVER ALLOWED IN LESS OR IMPROPERLY DISPRESSED ILLUMINATION/LIGHTS.
·    ALL WORK AT NIGHT ARRANGEMENT MUST BE DONE BEFORE START OF WORK AT NIGHT.
RIGGING SUPERVISOR
2
2
2
9
HOUSEKEEPING
WASTE DRUMS
SHOPPER BAGS
·    ENVIRONMENT HAZARD
·    SLIP, TRIP & FALL
·    WASTE MATERIAL SHOULD BE STACKED PROPERLY & DUMPED IN DESIGNATED PLACES.
·    WASTE MATERIAL SHOULD BE BARRICADED.
RIGGING SUPERVISOR
1
2

Severity Rating:(1) First Aid / Minor Property Damage                            (2) Recordable Accident / Property Damage
(3) Lost Time Accident / Major Property Loss                 (4) Catastrophic Accident

Are you aware of, and do you have the correct PPE?             What are the risks?                               How do controlled risks?



                   _______________________________                                                                                      __________________________
AREA ENGINEER / SUPERVISORHSE REPRESENTATIVE