Skip to main content

NEBOSH IGC Sample Paper New Pattern

IG1-SAMPLE-IG1-QuestionPaper-SAMPLE © NEBOSH 2019

This question paper MUST be returned to NEBOSH after the examination and must NOT be copied

Duration of examination: 2 hours

Answer ALL questions.
The maximum marks for each question, or part of a question, are shown in brackets.
Start each answer on a new page.

Answers may be illustrated by sketches, where appropriate.
This question paper must be returned to the invigilator after the examination.
You are advised to spend about half an hour on Question 1.
You are advised to spend a total of about one and a half hours on Questions 2-11.

1      (a) Why is it a good idea to use a permit-to-work system for some work activities? (3)
        (b) What types of work activity would you use a permit-to-work system for? (5)
        (c) What do you need to have in place for a permit-to-work system to work in practice? (8)
        (d) What roles should be allocated in a permit-to-work system? (4)

2     What are an employer’s health and safety responsibilities? (8)
3     Explain what an organisation should do to provide effective first-aid .(8)

NEBOSH International General Certificate in Occupational Health and Safety

UNIT IG1 Management of health and safety

IG1-QP-SAMPLE © NEBOSH 2019 2 of 3

This question paper MUST be returned to NEBOSH after the examination and must NOT be copied

4      What are the best ways of communicating health and safety information to workers?(8)

5      What are possible costs to an organisation of work-related incidents?(8)

6      Explain why a health and safety policy may need to be reviewed.(8)

7      What should you consider when deciding how often active monitoring should take place?(8)

8      Explain what an organisation should consider when looking into the suitability of a potential         contractor.(8)

9      What internal documents could be gathered for analysis during an incident investigation?(8)

10    (a) Explain the term ‘health and safety culture’.(2)
        (b) How can health and safety culture at work be improved?(6)
11    What things should be considered when putting into place a safe system of work?(8)

Download

Comments

Popular posts from this blog

Job Safety Analysis for Lifting and Rigging

LOGO JOB SAFETY ANALYSIS Download Doc. No.: Rev.: Date: Page: Project:                        Project#:                      Area: General Comments: Date:                                         Supervisor:   Job Description: Lifting & Rigging Activity (Loading/Unloading of the Equipment) Item Detail of Activity Equipment & Tools used Risk Involved Preventive Measure Responsible Person Severity Rating 1 TRANSPORTATI ON   OF   THE MATERIALS & CRANE TO JOB SITE. ·     CRANE ·     TRAILER ·     FLAT BED ·     MULTI AXEL TRAILER ·        LIFTING GEARS (SLINGS, SHACKLES, WEB-BELT, TAG LINE, CHAIN BLOCK, LEVER HOST, FORK LIFTER, PICK WAY TRUCK & ETC). ·     UNEVEN ROAD ·     UNSAFE CONDITIONS ·     CRANE SHOULD BE CHECKED, BEFORE TRANSPORTATION TO JOB SITE ON DAILY BASIS. RI

Health & Safety Engineer in Daewoo

DPEBSL is hiring Health & Safety Engineer for Peshawar. The ideal candidate must have experience of 4 to 6 years of working in a large fast paced organization. Responsibilities: Ensure all kinds of work is carried out in safe manner. Implement Work Permit System and Log out/Tag out system while working on high power electrical equipment. Design and implement SOP’s to ensure personnel and equipment safety while working on High voltage compartment of buses EVSE Equipment Monitoring station of chargers Miscellaneous equipment/areas Conduct initial and regular safety training’s of BRT Staff to ensure safe work environment. Requirements: Bachelor’s Degree (Occupational Safety & Health, Engineering , Risk-Management or related study), or demonstrated experience in the safety -consulting field from OSHA or NIBOSH. Excellent communication skills, Leadership abilities, outstanding organizational skills Minimum 4-6 years’ experience in operations function at professional